Project

Pre-feasibility Studies for Establishing a Coal Gasification Plant at Bhakkar, Pakistan

project-1-1

Project Details

Client
Sui Northern Gas Pipeline Ltd, Pakistan
Type of Project
Pre-Feasibility Study for Energy Infrastructure Development
Location
Bhakkar, Punjab
Start Date
2006
End Date
2007

Project Description

This project aimed to assess the feasibility of establishing a coal gasification plant in Bhakkar, Punjab, by evaluating coal supply sources, transportation logistics, and production capabilities. Conducted in collaboration with Minrocon and DMT GmbH (Germany), the study focused on analyzing the viability of coal-based gasification as an alternative energy solution.

Scope Of Work:

  • Review of Existing coal mines located in the Salt Range and Makarwal.

          – Geological conditions.

          – Present production capacity Costs.

          – Available mining methods.

          – Improvements to maximise production.

          – Supply of coal over the lifetime of the gasification plant.

  • Coal sample collection and transportation of 10 tons of coal samples to the International Laboratory for analysis.
  • Survey of Railway and Road Routes for the supply of coal to the gasification plant.

Want to connect with us?

About Us

DES Private Limited has been providing expert consultancy and technical services in cement, mineral exploration, and industrial sectors for over 26 years.

Phone:

+92 42 35455755

Email:

Address:

31-E, Block J III, Johar Town, Lahore, Pakistan

Monday – Friday: 9:00 AM to 5:00 PM