Project

Thar Coal Integrated Mining & Power Project (Pakistan)

6B

Project Details

Client
Govt of Sindh, Pakistan
Type of Project
Integrated Mining & Power Development Project
Location
Thar, Sindh
Start Date
2008
End Date
2012

Project Description

Worked as a Partner with “Australasian Continental Energy Pty Ltd Australia (AACE)” for an integrated mining & power project. The project involves opencast mining of 18 million tons per annum of coal & 3000 MW of power generation.

Key features of the project were based on the following three stages:

  1. Mining Bankable Feasibility Study (BFS)
  • Coal reserves to JORC standard (confirmation)
  • Extraction process
  • Mine Design
  • Plant design
  • Equipment and infrastructure requirements
  • Environmental issues
  • Financial viability
  • Hydrogeology
  • Social Impact Studies
  • Alternative processing methods
  1. Mining operations were planned for uninterrupted coal supply for power generation.
  2. Power Generation

Want to connect with us?

About Us

DES Private Limited has been providing expert consultancy and technical services in cement, mineral exploration, and industrial sectors for over 26 years.

Phone:

+92 42 35455755

Email:

Address:

31-E, Block J III, Johar Town, Lahore, Pakistan

Monday – Friday: 9:00 AM to 5:00 PM

Phone:

+92 42 35455755

Email:

Address:

31-E, Block J III, Johar Town, Lahore, Pakistan

Monday – Friday: 9:00 AM to 5:00 PM